|
Glendale Water Supply Improvement Project Presentation - 2007
(PPT - large file, allow time to download)
Glendale Diversion Weir and Intake Physical Model Study -
(Windows Media Files)
Part 1: Introduction
Part 2: Project Description
Part 3: Project Objectives
Part 4: Model Description
Part 5: Initial Design Testing
Part 6: Design Development Testing
Part 7: Detailed Documentation Testing
Glendale Diversion Analysis - Phase II January
2003
The following documents are all a part of the analysis:
Site Evaluation
     Figure
1
     Figure
2
     Figure
3
     Figure
4
     Figure
5
Glendale Diversion Weir
& Intake Design Memo
     Plate
1
     Plate
2
     Plate
3
     Plate
4
     Plate
5
     Plate
6
     Plate
7
     Plate
8
Glendale
Diversion Fisheries Engineering Investigation
     Figure
1
     Figure
2
     Section
A
     Section
B
     Section
C
Draft Vegetation
Analysis
Fish
Screening Criteria for Anadromous Salomnids
Nationwide
Permit Summary
Screen
Costs vs. Flow Rate Chart
    
Glendale
Diversion Evaluation
51.7MB (PDF) ~ 5 minute download time on a high-speed connection
Eco:Logic performed an analysis for short-term and long-term recommendations
to provide the Glendale Water Treatment Plant with a water supply
capacity of 28 million gallons per day.
Informational
Slides (PPT)
Two slides containing graphics of the Truckee
River System and the diversions by percentage.
Presentation
from Public Meeting on 8/23 - (PDF)
Complete PowerPoint presentation as shown at the public meeting.
Glendale Water Supply Improvement Project
Consensus Paper by Project Working Group (PDF)
|