Welcome to the Glendale Water Supply Project!



 

Sign up for news and meetings by email:

Name:
Email:

 

 

 


Truckee Meadows Water Authority
P.O. Box 30013
Reno, NV 89520
TMWA Home Page
Welcome to the Glendale Diversion Project
 

All documents pertaining to this project will be posted here when finalized.

Glendale Water Supply Improvement Project Presentation - 2007
(PPT - large file, allow time to download)

Glendale Diversion Weir and Intake Physical Model Study -
(Windows Media Files)

Part 1: Introduction
Part 2: Project Description
Part 3: Project Objectives
Part 4: Model Description
Part 5: Initial Design Testing
Part 6: Design Development Testing
Part 7: Detailed Documentation Testing

Glendale Diversion Analysis - Phase II January 2003
The following documents are all a part of the analysis:
Site Evaluation
     Figure 1
     Figure 2
     Figure 3
     Figure 4
     Figure 5
Glendale Diversion Weir & Intake Design Memo
     Plate 1
     Plate 2
     Plate 3
     Plate 4
     Plate 5
     Plate 6
     Plate 7
     Plate 8
Glendale Diversion Fisheries Engineering Investigation
     Figure 1
     Figure 2
     Section A
     Section B
     Section C
Draft Vegetation Analysis
Fish Screening Criteria for Anadromous Salomnids
Nationwide Permit Summary
Screen Costs vs. Flow Rate Chart
    

Glendale Diversion Evaluation
51.7MB (PDF) ~ 5 minute download time on a high-speed connection
Eco:Logic performed an analysis for short-term and long-term recommendations to provide the Glendale Water Treatment Plant with a water supply capacity of 28 million gallons per day.

Informational Slides (PPT)
Two slides containing graphics of the Truckee River System and the diversions by percentage.

Presentation from Public Meeting on 8/23 - (PDF)
Complete PowerPoint presentation as shown at the public meeting.

Glendale Water Supply Improvement Project
Consensus Paper by Project Working Group (PDF)